Preston Barracks, Brighton
In February 2018, Brighton and Hove Council sold its derelict Preston Barracks site to the developer U+I Group; clearing the way for a significant mixed-use regeneration project. U+I simultaneously exchanged contracts to partner with Scape Student Living to deliver 534 student beds.
The scheme is part of a wider regeneration initiative to transform an area of Brighton, establish the University at the centre of Brighton’s economic life, attract enterprising and high-growth companies, and attract international investment.
Designed by award-winning architects HASSELL, Studio Egret West, TP Bennett and Stride Treglown, the proposals for the 2.2 hectare plot include the development of the Preston Barracks site (which has been derelict for more than 20 years), the University’s Moulsecoomb campus and adjoining University land comprising:
- 369 new homes.
- 1,338 student beds.
- New academic buildings.
- 25,000 sq. ft. of retail space.
- A 55,000 sq. ft. commercial building for start-ups and SMEs in high-tech manufacturing.
The project was granted planning permission in September 2017. It is hoped that the £300 million public private partnership project will create more than 1,500 jobs, and attract more than £500 million into the city over the next ten years.
Richard Upton, Deputy Chief Executive of U+I, said:
"The Preston Barracks project is one of the largest and most ambitious regeneration projects to have been brought forward in Brighton for a number of years. We will deliver world class, imaginative urban design, leaving a lasting legacy that befits such an inspirational city".
In May 2018, it was confirmed that John Graham had been appointed main contractor for the first phase of the construction works.
Graham's contract is for a seven-storey concrete-framed workspace building, targeting a BREEAM 'excellent' rating. The Central Research Laboratory will be used as a workspace aimed at small businesses and start-up companies. It is expected to be completed by the end of 2019.
U+I development manager Sarah Chitty said: “We’re proud to be working with Graham on the first phase of the project. Their commitment to supporting local communities and economies is closely aligned to our own vision to create long lasting benefits for the places in which we work.”
Graham development director Rob Joyce said: “Our main objective is to create a high-quality commercial building that will attract enterprising, high-growth companies to the area. We will work closely with U+I and the project team to ensure that it provides a range of functioning spaces that are tailored to the needs of the individuals using it, while fostering entrepreneurship and excellence in innovation.”
--U and I
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Clapham One.
- Development Securities.
- Maidstone development.
- Mixed-use development.
- Placemaking.
- Public private partnership.
- Regeneration.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- UandI Think event with John McDonnell MP.
[edit] External references
- U+I - Preston Barracks
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
Comments